*


1 – Cruise terminal of Pointe Simon :

A 295 yards wharf, draft 10m.
Two berths :
-West pier : Cruise liners up to 200m long
-East pier : Cruise liners up to 270m long

2 – Landing jetties for local ferries

3 – West Quay :

Length: 160m, draught: 7m. Inter islands passenger traffic.

4 – The Dry Dock :

Length: 200m
Draft: 8m. Ship repairs.
Capacity 12 000 to 20 000 gross ton ships.

5 – The grand cargo quay:

Length: 180m
Draft: 9m. Cruise traffic and conventional general cargo.

6 – Annexes berth:

Length: 180m
Draft: 8m. small cruise traffic.

7 – The Tourelles berth (North and South) :

Length: 325m
Draft: 11m. Priority for Cruise Ship Liners.

8 – The Tourelles berth end :

Length: 83m
Draft : 8 to 11m sailboats or yachts

9 – Bitumen Berth :

Frwd draft :4,50 m ; After draft :5,50m

10 – Carθne antilles :

A full-service marina and boatyard.

11 – The Hydrobase quay:

Length: 220m
Draft: 11m.
Conventional general cargo. The quay has a silo for bulk handling of Cereals

12 – The south terminal berth :

Length: 418m
draft: 12m
Dedicated car carriers berth and storage area.

13 – Crude oil and bulk mineral pier:

Capacity 120 000 tons deadweight
Draft: 14m
Oil supply, clinker and gypsum in bulk.

14 – New container Terminal of Pointe des Grives:

Length: 460m
Draft: 14m
Capacity 150 000 TEU, equipped with 3 low profile PACECO shore gantry cranes 40 metric tons lifting capacity and operated by computerized process for positioning and delivery of containers.